Previous Page  7 / 60 Next Page
Information
Show Menu
Previous Page 7 / 60 Next Page
Page Background

Successfully Producing LNG for a Half-Century

From Kenai first producing and importing LNG to Japan in 1969 to starting up 15 new

large-scale LNG trains on-time in Australia and the U.S. Gulf Coast over the past four years,

the Optimized Cascade® process provides more than 100 million metric tons per year of

the world’s LNG supply capacity and is licensed in 27 trains around the world.

To learn more, visi

t lnglicensing.conocophillips.com.

We Deliver:

• Industry-leading performance, efficiency, and operational flexibility

• Predictable execution, startup and operation

• Scalable train design from 1.5 to 7 MTPA

• Wide feed gas composition capability

Liquefied Natural Gas

Optimized Cascade® is a registered trademark of ConocoPhillips Company in the

United States and certain other countries.

© ConocoPhillips Company. 2019. All rights reserved.

The Optimized Cascade® process now provides

more EPC Contractor choices for our clients

The

Optimized Cascade

®

process:

Proud past, bright future

5O