he Canadian LNG industry entered the new decade with

only a single sanctioned LNG export project: Trains 1

and 2 of Shell-operated LNG Canada, located in Kitimat,

British Columbia (B.C.). Following LNG Canada’s positive final

investment decision (FID) in October 2018, sentiment around

Canada’s LNG potential grew increasingly cautious as 2019

progressed with no additional FID activity. By November 2019,

industry voices were warning of Canada’s late arrival to an

increasingly crowded global LNG market. 4Q19 impairments

by Chevron and Woodside of their respective shares in the

Kitimat LNG project only seemed to compound this sentiment.

Although Canada will not become the LNG behemoth

envisioned by industry players and policymakers prior to the

onset of East Asian price volatility in 2015, several

developments over the past year suggest that there may yet

be potential for additional large scale LNG development in

the long-run. Most importantly, there has been a concerted

push for greater integration between export projects and local

sources of supply, both in terms of upstream acquisitions

made by LNG operators, as well as producer-led export

initiatives. While current proposals vary in feasibility, the trend

nevertheless indicates that Canada’s active remaining LNG

players maintain a long-term interest in the industry.

The shift towards integrated LNG

models

Whereas LNG Canada always featured a high degree

of overlap between its working interest partners and

upstream suppliers in the prolific Montney play, smaller

LNG players have increasingly moved towards an integrated

model through major upstream acquisitions in the

Western Canadian Sedimentary Basin (WCSB).

Notably, in May 2019, Pacific Oil & Gas – an Indonesian

independent and developer of the 2.1 million tpy Woodfibre

project in Squamish, B.C. – announced an agreement to

acquire Montney pure play Canbriam Energy for an

undisclosed value. Rystad Energy estimated Canbriam’s net

present value (NPV) at approximately US$900 million at the

time of announcement, which included over 180 000 net acres

of Montney lands in northeast B.C. and some of the best

operating cost performance across the entire Montney play. In

addition to its high-value liquids yields and competitive cost

structures, Canbriam’s fractured horizontal Montney wells

typically featured lower decline rates, thanks in part to the

company’s water strategy and active well defence.

With the acquisition of Canbriam, Rystad Energy estimates

that Pacific will be able to ramp up its Montney output with a

modest level of drilling activity and operate as an integrated

LNG player by the time Woodfibre is commissioned in the

mid-2020s.

Pieridae Energy, which is aiming for a 2020 FID on the

first train of its 10 million tpy Goldboro LNG facility in

Nova Scotia, has likewise continued to push forward with a

more integrated development concept, following its

December 2018 business combination with Alberta Foothills

gas producer Ikkuma Resources. In June 2019, Pieridae

announced further consolidation of its upstream Foothills

position through the acquisition of Shell’s conventional legacy

assets in the area, whose production stood at approximately

120 million ft³/d of natural gas, 5700 bpd of natural gas

liquids (NGLs), and 3200 bpd of condensate and light oil. The

deal consisted of a cash consideration of CAN$175 million

and the issuance to Shell of 15.2 million common shares

valued at CAN$15 million.

The Shell transaction essentially doubled Pieridae’s

natural gas output to more than 200 million ft³/d, and the

company subsequently announced plans to grow production

to an ambitious 800 million ft³/d to supply the first

5 million tpy train of Goldboro in time for commissioning in

2024 – 2025. The company has indicated an upstream

investment program of approximately CAN$1 billion to grow

output, which would involve drilling between 25 and 35

development wells annually over four years. The upstream

development program is underpinned in principle by

11